ESPACE MONTMORENCY TOWER 2, TOWER 3 ET FOOTBRIDGE

Location:

Montreal region (QC) / North Shore area

Developer:

Fonds immobilier de solidarité FTQ, Montoni / Building Managment : Consortium MGS s.e.n.c.

Architect:

Lemay and Sid Lee Architecture / Pelland Leblanc Architects SENC

Number of storeys:

Tower 2 – 16

Tower 3 – Hotel: 10

Tower 3 – Footbridge: 1 connecting to Tower 2 and Tower 3

Lessard systems:

Tower 2 :

  • Factory Prefabricated Unitized Curtain Wall 5000 Series;
  • Smoke extraction shutters, with hinged panels opening outward;

Tower 3 – Hotel :

  • 8560 Series Windows;
  • Smoke extraction shutters, with hinged panels opening outward;

Tower 3 – Footbridge

  • Factory Prefabricated Unitized Curtain Wall 5000 Series.
Year of completion:

2019-2022

Description:

A large mixed-use complex that combines office spaces, retail, residential units, and a hotel. Prefabrication was a focal point for this project, both for Tower 2, entirely constructed with curtain wall panels prefabriated at our Laval facility, and for Tower 3, where windows were manufactured at our facility and installed at Béton préfabriqué du Lac Inc. (BPDL). This construction method speeds up the installation process and enhances quality control under optimal conditions during prefabrication.

Have a project for us?

Scroll to Top